AVARIS working for KENTRIKI ODOS
Implementation study regarding signage for prohibition of heavy vehicles (over 3.5tn) using the service roads and the alternative road network of E65 Motorway.
Greece
AVARIS working for KENTRIKI ODOS
Study to revise speed limit signage along ATHE motorway's section between Scarfia and Raches.
Greece
AVARIS working for NEA ODOS
Survey and Coding of Non Pavement Elements for NPMS (Non-Pavement Management System) as part of the HMMS (Highway Maintenance Management System) and GIS development, for IONIA ODOS highway - Sections Antirrio I/C (5+200) to Kefalovriso (48+000) and Amfilochia I/C (106+000) to Pedini I/C (201+000).
Greece
AVARIS working for KENTRIKI ODOS
Survey and Coding of Non-Pavement Elements for NPMS (Non-Pavement Management System) as part of the HMMS (Highway Maintenance Management System) and GIS development, for E65 highway. Section Xiniada I/C (31+842) to Trikala I/C (111+387).
Romania
AVARIS with COWI Belgium working for the EIB
Support to JASPERS for Railway and Urban Transport Projects in Romania. Multipurpose support for railway and urban transport; In situ inspection; discussions with municipalities; composing sustainable parking policy guidelines; parking policy assessment of 10 Romanian cities.
Greece
AVARIS working for NEA ODOS
Implementation study regarding guide signage for the access to Ionia Odos motorway.
Greece
AVARIS working for GAIAOSE
Technical and Financial Feasibility for Egnatia rail project – Technical and Financial Feasibility for the development of logistic centres along Egnatia. (Traffic forecasts, transport model, cost benefit analysis).
Ghana
AVARIS working for MYTILINEOS
Highway Design (access road and internal plant roads) for the project: «Design, Engineering, Procurement, Construction Commissioning and Testing of an up to 192MW Dual Fired Combined Cycle Facility near Aboadze, Ghana».
Greece
AVARIS working for TERNA
Traffic and Revenue Advisor for the Permanent Road Link Project of Salamina (Traffic surveys and Stated Preference surveys for the calculation of VoT).
Greece
AVARIS working for NEA ODOS
Survey and Coding of Non-Pavement Elements for NPMS (Non-Pavement Management System) as part of the HMMS (Highway Maintenance Management System) and GIS development, for IONIA ODOS highway - Section Kouvaras I/C (80+700) to Amfilochia I/C (106+000).
Elefsina, Greece
AVARIS working for the Port Organisation of Elefsis
Design and supervision of the existing quay wall repair including under water video and photographic survey, bathymetric plan and repair works final design. Preparation of construction tender documents and supervision of works.
Greece
AVARIS working for Ministry of Infrastructure and Transport, Managing Authority
Preparation of Cost-Benefit Studies and support in the application for the investment in rail project implementation. Transportation modelling to establish passenger and freight demand and corresponding volumes on the country’s rail network for the rail projects of:
• Polikastro - Idomeni modernization and upgrade
• ETCS I installation (wayside)
• Central Athens Station
• Variety of interventions on the Athens-Thessaloniki rail corridor.
Greece
AVARIS working for KENTRIKI ODOS
Survey and Coding of Non-Pavement Elements for NPMS (Non-Pavement Management System) as part of the HMMS (Highway Maintenance Management System) and GIS development, for PATHE highway. Section 205+000 CH. to Raches I/C (242+000).
Greece
AVARIS working for NEA ODOS
Survey and Coding of Non-Pavement Elements for NPMS (Non-Pavement Management System) as part of the HMMS (Highway Maintenance Management System) and GIS development, for IONIA ODOS highway - Section Kefalovriso (48+000) to Kouvaras I/C (80+700).
Poland
AVARIS with GOPA working for JASPERS Poland
LOT 4 Framework Agreement (EIB - COWI) – Transport and Urban infrastructure. Provision of specialized rail engineering services. Review of Feasibility Studies for PKP Lines 14 (Lodz Kaliska – Ostrów Wielkopolski), 182 (Tarnowskie Gory – Zawiercie), 25 (Skarżysko Kamienna - Sandomierz), EC 59 (Chorzów Batory - Tarnowskie Gory - Karsznice - Inowrocław - Bydgoszcz - Maksymilianowo).
Syros, Greece
Municipality of Syros
Traffic management study for the Ermoupolis central district with emphasis on summertime TSM measures
Attica, Greece
AVARIS working for NEA ODOS
Traffic Impact Assessment Study regarding the installation of lateral toll facilities on the PATHE Motorway Interchanges of Varibombi and Agios Stefanos
Attica, Greece
AVARIS working for PAEGAE SA
Preliminary Design and technical feasibility of a rail connection (freight branch line of 4,5 kms) linking the PAEGAE SA Logistics Center (1 million sqm) at Magoula in Attica with the main rail network and Thriassion rail logistics center
Greece
AVARIS working for NEA ODOS
Stated preference survey among motorway users in mainland Greece to establish “Value of Time” for use in toll motorway modelling. Consultant to Client in-house team for the traffic model development (calibration / forecast - SATURN)
Crete, Greece
AVARIS with Louis Berger Group working for Tendering Consortium
Development of the new Airport at Kasteli (Crete) as a concessionary project. Traffic and Revenue Advisor.
Greece
AVARIS working for SKODA TRANSPORTATION
Provision of Technical Expertise support regarding tram vehicle emergency evacuation performance in the context of the tram rolling stock procurement for the Athens tramway system.
Turkey
AVARIS with GOPA working for the Ministry of Transport IPA Unit in Turkey
Upgrade of the Halkali – Kapikule Railway Line. Technical and Financial Feasibility Study. Conceptual design of alignment alternatives, analysis of technical characteristics (line, stations, depots etc), operational planning, demand modelling (VISUM and SATURN), Cost Benefit Analysis, multi criteria evaluation. Support of the process to obtain approvals by Turkish Railroads (TCDD) and funding by EU/EIB.
Greece
AVARIS with Louis Berger SARL working for the Hellenic Republic Private Assets Development Fund
Technical support to the Fund regarding the sale of 100% of the shares of the State Railway Operator (TRAINOSE) and the State Rail Rolling Stock Maintenance Company ROSCO (EESSTY). Review and assessment of technical characteristics of rail network, passenger and freight services, PSO contracts, rolling stock leasing and maintenance contracts, real estate leases, potential for development by the rail sector at specific locations, rolling stock needs evaluation.
Greece
AVARIS working for NEA ODOS
Survey and Coding of Non Pavement Elements for NPMS (Non-Pavement Management System) as part of the HMMS (Highway Maintenance Management System) and GIS development, for ATHE highway Section Metamorfosi I/C (15+200) to kp 205+000. Design and execution of relevant survey using a specially modified vehicle equipped with cameras and special GPS and inertial navigation system owned and operated by AVARIS.
Greece
AVARIS working for NEA ODOS
Development of a Highway Maintenance Management System for ATHE Motorway. Development of a GIS and a Transportation Asset Management (TAM) system. Motorway maintenance optimization through Performance Based Management. Design of a Highway Maintenance System to integrate the maintenance of pavements, structures and non-pavement elements (highway furniture).
Greece
Ministry of Development and Infrastructure, Transport Managing Authority
Support to the Hellenic Transport Program Managing Authority in Connection with the Preparation of Operational Program of investment in transport infrastructure 2014 – 2020. Comparative evaluation of projects candidates for inclusion to the program and formulation of the investment program project pipeline.
Slovenia
European Commission, Directorate General for Regional Policy, Policy Coordination
Client Support in connection with the preparation of projects/actions for the Slovenian Funding Program in The Transport Sector for the fifth Programming Period (2014-2020).
Greece
AVARIS working for NEA ODOS
Traffic Advisor for Ionia Odos and E65 Motorway concession projects. Concessionary project co-funded by the Greek Government. Investigation of a “Hybrid” rebate-type Toll System in the vicinity of Athens. Traffic surveys and RSS. Provision of passenger and revenue forecasts (SATURN).
Greece
AVARIS and Diavasi S.P. working for NEA ODOS
Independent Traffic Advisor for claims against the Hellenic Republic. Traffic modelling, financial analyses. Macroeconomic analysis.
Peloponnese Greece
AVARIS working for DOXIADIS
Client Support in the preparation of the Peloponnesus Regional Plan – Transport Sector.
Greece
AVARIS working for Hellenic Accreditation System SA (ESYD)
Investigation of accreditation potential in the field of transport and more specifically in rail transport especially related with safety issues.
Greece, Bulgaria, Romania, Hungary
AVARIS with WS Atkins and Prisma ATE working for the Hellenic Railways (OSE)
Preliminary feasibility study for the upgrade of Rail Axis 22 (2043 kms) through the four countries. Technical assessment, interoperability issues, conceptual design of alignment improvements and other works to modernize the line and stations, transport modelling (TRANSTOOLS, QRS II).
Attica, Greece
AVARIS working for CAMPION SCHOOL
Campus Traffic and Parking Organization.